Home Renovation Budget Planner

Track estimates against actual costs and see the projected total for your renovation.

Your numbers

The most you can spend. Leave blank to skip the comparison.

Example value. A cushion for surprises, added to items that are not finished yet.

Budget items
Item 1
Item 2
Item 3
Item 4

Result

Projected total with contingency

$26,230.00

4 items

Estimated total
$23,800.00
Contingency (10%)
$2,380.00
Planned total with contingency
$26,180.00
Actual cost so far
$2,800.00
Actual minus estimate, finished items
$300.00
Projected total (actuals, then estimates)
$24,100.00
Contingency left on unfinished items
$2,130.00
Projected total with that contingency
$26,230.00

Items

ItemEstimateActualActual minus estimateShare of estimates
Demolition and haul away$2,500.00$2,800.00$300.0010.5%
Cabinets and counters$14,000.00Not yet58.8%
Flooring$5,500.00Not yet23.1%
Paint$1,800.00Not yet7.6%
How this was calculated
  1. Estimated total = sum of estimates = $23,800.00. Contingency = 10% of that = $2,380.00.
  2. Projected total = actual cost where entered ($2,800.00) plus the estimate for items with no actual yet ($21,300.00) = $24,100.00.
  3. Contingency is added only to the estimates of unfinished items: 10% = $2,130.00. Projected total with contingency = $26,230.00.
  • Amounts and the contingency percent are examples or your own figures. The tool adds up what you enter. It does not know local prices, permits, taxes, financing costs or how long the work takes, and it is not a quote.

Calculated using SumPanda.com · https://sumpanda.com/renovation-budget-planner/

Results are estimates for general information. Verify important figures before relying on them.

Next step

How to use the home renovation budget planner

  1. Optionally enter the total budget available, and set a contingency percent as a cushion for surprises.
  2. List each budget item with its estimate. The amounts shown are examples, so replace them with your quotes.
  3. As work is finished, enter the actual cost for that item.
  4. Read the planned total, the projected total with contingency, how far actual costs have moved from the estimates, and whether you are under or over the budget you entered.

Formula

Estimated total = sum of all estimates

Contingency = estimated total x contingency percent

Projected total = actual cost where entered + estimate where not

Contingency left = estimates of unfinished items x contingency percent

Projected with contingency = projected total + contingency left

Headroom = budget available - projected with contingency

Contingency is applied only to items without an actual cost, because finished items no longer carry the unknown.

A kitchen refresh

The four example items have estimates of $2,500, $14,000, $5,500 and $1,800, which total $23,800. A 10% contingency adds $2,380, so the planned total is $26,180.

Demolition is finished and cost $2,800, which is $300 more than its estimate. The projected total uses that $2,800 plus the three estimates still open ($21,300), giving $24,100. The contingency on the open items is $2,130, so the projected total with contingency is $26,230. With a budget of $30,000, that leaves $3,770 of headroom.

Why track actual costs against estimates

A budget is a set of guesses until the invoices arrive. Entering actual costs as you go turns the guess into a running total, and the variance on finished items shows whether your estimates are running low or high. If the finished items are all over, the remaining ones may be too.

The contingency percent is yours to set. A higher figure suits work with more unknowns, such as opening up old walls. The 10% shown is an example, not a recommendation.

What is not in the totals

The planner adds up the numbers you give it. It does not know local prices, permits, taxes, financing costs, temporary housing or how long the project will take, and it is not a contractor quote. For individual materials, the paint calculator, the flooring calculator and the drywall calculator estimate quantities, and the house flip calculator covers a purchase and resale.

Assumptions and limits

  • Amounts and the contingency percent are examples or numbers you enter.
  • Contingency is applied to the estimates of items without an actual cost.
  • Money is added in dollars and rounded to the cent.
  • Permits, taxes, financing and delays are not modeled.

Formulas reviewed October 10, 2026. See the calculation methodology for how SumPanda rounds, tests and sources its formulas.

Frequently asked questions

How much contingency should a renovation budget have?

There is no single right figure. The 10% in the form is an example. Use more for older buildings or work with many unknowns, and less for simple, fixed-price jobs.

Why does contingency drop when I enter actual costs?

Once an item is finished its cost is known, so it no longer needs a cushion. Contingency stays on the items still to be done.

What does the headroom line mean?

It is your total budget minus the projected total with contingency. Positive means you are under budget, and negative means over.

Can I print the budget for a contractor meeting?

Yes. Use Print or the PDF button to get a copy of the items, the totals and the assumptions.